Work order management system
Work order management systems use a dashboard-based software approach to track and manage relevant maintenance projects and processes for facilities management departments. Work orders are typically related to the upkeep of equipment and can incorporate both simple and complex tasks such as changing an air filter or replacing an entire HVAC (heating ventilation and air conditioning) system.
Work order management systems are suitable for multi-site organisations and can be integrated with enterprise asset management (EAM) software or computerised maintenance management systems (CMMS). EAM and CMMS are different types of work order management systems.
Contents |
[edit] Characteristics
Work order management systems document basic processes - create work orders, request updates, track task completions - which are then broken down into smaller tasks. These systems can be tailored to incorporate requirements necessary for auditing purposes, regulatory requirements or other business-specific concerns.
Some systems are also able to monitor additional tasks associated with maintenance work orders:
- Prioritise requests (emergency request or planned repair).
- Provide details of the task, including safety requirements and special tools needed for the job.
- Gather job costing and billing information.
- Track time for task completion (including projected downtime).
- Summarise tasks by trade or job type.
- Create summaries for managers based on department requests.
- Monitor supplies, costs and warranties (including inventory management).
- Generate preventive maintenance schedules.
With a computerised work order management approach to maintenance, work orders are created in real time. They are then assigned and sent directly to the appropriate tradesperson to complete based on the information provided. It is possible to order replacement parts simultaneously with the creation of the work order.
[edit] Generation of work orders
Work orders are typically generated when an internal request is made, but they can also come about after a general facility inspection or safety audit. Property inspections may reveal maintenance issues with electrical systems, roofing or other site features. Safety audits can trigger repairs for signage, lighting, waste management and other hazardous situations.
Preventive maintenance tasks can also be a source of work orders, particularly when they identify the need to replace parts, materials or supplies.
[edit] Reporting capabilities
Work order management systems track the progress of maintenance tasks. They can also trigger alerts if problems occur or if a task has not been initiated.
Once the task is complete, the system can generate reports for data mining. This analysis can be used for assessing budgets and resource availability and for other planning purposes.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.